Book a free consultation (opens in a new tab)

Case study

Global distributor ERP: five countries on one SAP S/4HANA system

A multi-national industrial parts distributor consolidated five country operations onto SAP S/4HANA, with a single group close and one view of stock.

Results

  • 5Countries Unified on One SAP InstanceTo confirm · Internal measure
  • 31%Reduction in Group Operating CostsTo confirm · Internal measure
  • 4 hrsMonth-end Close Time (was 12 days)To confirm · Internal measure
  • 0Data Silos Remaining Across the GroupTo confirm · Internal measure

Five separate ERP systems. Five P&L reports. None of them in the same format.

This industrial parts distributor had grown through acquisition across five countries over eight years.

Each country operation ran its own ERP system two ran legacy systems from the 1990s, one ran a regional accounting package, one used a spreadsheet-based warehouse system, and one had implemented a modern mid-market ERP that did not integrate with any of the others.

The result was five completely isolated operations that shared a brand name but no operational data. Intercompany stock transfers required manual documentation in both systems. Transfer pricing was calculated in spreadsheets by the finance team and often took three days to agree between country controllers. Customers who wanted to order across multiple countries had to deal with completely different processes in each location.

The CFO received five different P&L reports every month-end one from each country, in different formats, with different chart of accounts structures. Consolidating them into a group P&L took 12 working days. By the time the consolidated numbers were ready, the month being discussed was already three weeks in the past.

Strategic decisions which countries to expand, where to reduce inventory, which product lines were profitable across the group were being made without reliable cross-country data. The board had identified the disconnected systems as a strategic risk and committed to unifying the group on a single enterprise platform. The requirement was SAP S/4HANA the only system credibly able to handle the scale, complexity, and multi-country compliance requirements across all five operations simultaneously.

What Was Holding the Group Back

  • Five separate ERP systems with no integration intercompany transactions required double-entry in both country systems, creating reconciliation errors every period
  • Month-end close took 12 working days because consolidation was done manually by the group finance team from five differently structured reports
  • Transfer pricing between subsidiaries was calculated manually in Excel, creating a compliance risk in three of the five operating territories
  • No group-level inventory visibility the same parts were held as excess stock in one country while on order in another, at significant carrying cost
  • Country-specific tax rules, VAT configurations, and regulatory reporting were handled differently in each system, with no standardization across the group

Enterprise Distribution ERP for a Global Group

  • Multi-company Finance & Consolidation. All five legal entities on one SAP instance with automated intercompany reconciliation, transfer pricing, and real-time group P&L consolidation
  • Extended Warehouse Management (EWM). Group-wide inventory visibility with cross-country stock transfer workflows, reducing duplicate stock holdings across the five-country network
  • Transportation Management (TM). Cross-border shipment planning and carrier management with customs documentation generated directly from SAP for all five countries
  • SAP Analytics Cloud. Executive dashboards for group margin, country P&L, inventory value, and supplier performance live, with no manual extraction required
  • Tax & Regulatory Compliance. Country-specific VAT, GST, and trade compliance configurations for all five territories with automated regulatory reporting built in

How it was delivered

  1. Group Blueprint & Country Template Design (Weeks 1–6). We conducted a full process audit across all five country operations, identified the common core and the country-specific requirements, and designed the group SAP S/4HANA template. Finance, warehouse, procurement, and compliance teams from all five countries participated in blueprint sign-off workshops.
  2. SAP Build, Data Migration & Country 1 Go-live (Weeks 7–16). The group template was built and tested. Country 1 the largest operation migrated master data, opening balances, and historical inventory and went live first. A full month-end close was completed in SAP before Country 2 migration began.
  3. Countries 2, 3 & 4 Go-live (Weeks 17–24). Three countries went live in sequence using the localized group template. Each migration included data validation, a two-week parallel run, and a confirmed month-end close before the next country cut over. Intercompany transactions between live countries were tested and validated throughout.
  4. Country 5 Live & Group Analytics Activation (Weeks 25–28). The final country went live. SAP Analytics Cloud group dashboards were activated, showing live consolidated P&L, group inventory, and supplier performance for the first time. A 60-day hyper-care period covered the first two complete group reporting cycles on the new system.

Related

More case studies, and the case studies hub.

Your Global Distribution Group Could See This