Book a free consultation (opens in a new tab)

SAP to ERPNext

SAP to ERPNext Migration Services

Leaving SAP for ERPNext works well for mid-sized businesses running a fraction of what they licensed. It works badly where deep industry modules are doing real work.

  • 6-12 moTypical single entity
  • Stage 1Fit assessment, on its own
  • 3 yrTotal cost modelled, not a licence line
  • 0Per-user licence fees after

Why It Matters

The assessment is worth more than the migration

We sell the assessment, not the outcome

The first stage is a module-by-module review marking each area as a direct fit, a partial fit that needs development, or a genuine gap with no equivalent.

  • Every SAP module in use assessed and rated
  • Gaps costed as development, not waved through
  • A recommendation to stay is a valid outcome

Removing licence fees is not the whole picture

ERPNext has no per-user licensing, which is genuinely significant at scale. You still carry hosting, support, and development for anything that was standard in SAP and is not here.

  • Three-year total cost, not a licence saving
  • Gap development included in the model
  • Hosting and support costed realistically

Assessment first, then a phased migration

  1. Assess

    Module-by-module fit, gap costing and a three-year total cost model.

  2. Decide

    You decide with real numbers, including the option of staying on SAP.

  3. Design

    Entity structure, chart of accounts and gap development scoped and built.

  4. Migrate and test

    Data extracted, transformed, loaded and reconciled, then run in parallel.

  5. Cut over

    By entity or plant where possible, with SAP read-only afterwards.

What the project covers

  • Fit assessment report

    Every module in use rated direct fit, partial or gap, with the evidence behind each rating.

  • Cost model

    Three years of total cost for both options, including gap development and support.

  • Integration inventory

    Everything currently connected to SAP, with the work to re-point each one.

  • Custom code review

    Each custom development assessed as still needed, replaceable by standard, or obsolete.

  • Compliance mapping

    Statutory reporting and audit requirements confirmed as satisfied before cutover.

  • Phased cutover plan

    By entity or plant where the structure allows, with interfaces during the overlap.

Why teams choose TCB Infotech for this assessment

  • We will tell you not to move

    If the gaps are load bearing, that is the recommendation, and the assessment still stands alone.

  • Gaps are costed, not glossed

    Anything marked partial carries a development estimate, so the comparison is fair.

  • Three-year cost modelling

    Licence savings alone are a misleading way to make a decision this size.

  • We inventory the integrations

    What is connected to SAP is always longer than the list you start with.

  • Phased where possible

    Moving one entity or plant first removes most of the risk when the structure allows it.

SAP to ERPNext questions

Is moving from SAP to ERPNext actually realistic?

For many mid-sized businesses, yes, particularly where SAP was sized for a larger operation or inherited from a parent company. It is less realistic where you depend on deep industry-specific modules, very complex multi-entity consolidation, or regulatory functionality that has no equivalent. We assess that first and tell you if the answer is no.

What genuinely does not carry across?

Deep industry solutions, advanced planning and optimisation, and some highly specialised financial consolidation are the usual gaps. Standard finance, purchasing, sales, inventory and manufacturing map reasonably well. We produce a module-by-module assessment marking each area as a direct fit, a partial fit needing development, or a genuine gap.

How do you get data out of SAP?

Through standard extraction tools and reports, working with whoever holds your SAP access. Getting data out is normally straightforward. Transforming it is the work, because SAP structures such as company codes, controlling areas and plants do not map one to one onto ERPNext and those decisions need your finance team.

What about the licence and support savings?

They are usually the reason people start the conversation and they are real, but the comparison has to be honest. ERPNext removes per-user licensing, and you then carry hosting, support and any custom development. We model total cost over three years rather than comparing a licence line to zero.

Can we migrate one area at a time?

Sometimes, and it lowers risk considerably when it is possible. A distinct plant or subsidiary can move first while the rest stays on SAP, with an interface between them during the overlap. Where finance is tightly integrated across the group, a phased move is harder and we will say so.

How long does an SAP migration take?

Typically 6 to 12 months for a single entity, longer for multi-entity groups. The fit assessment and gap development drive the timeline far more than the data movement does, which is why we do the assessment as a separate first stage.

Start With the Assessment

No commitment. Staying on SAP is a legitimate conclusion.