A greenfield SAP build is decided in the fit-to-standard workshops, long before anyone configures a company code.

  • 9-18 moTypical greenfield build
  • 6Activate phases, gated
  • CleanCore, extensions on BTP

Why It Matters

SAP projects are not lost in Realize, they are lost in Explore

Start from the SAP process and argue your way out of it

SAP ships preconfigured standard scope items. We load them into a sandbox before the workshops start, so your process owners look at working screens instead of slides.

  • Workshops run on a live sandbox, not a document
  • Every gap logged with an owner, a reason and a cost
  • Deviations approved by the steering group, not by the project team

The code you write decides what your upgrades cost

Modifying SAP objects is the reason older landscapes became impossible to patch. We keep the core untouched. Small logic goes in key user extensibility inside S/4HANA.

  • Released APIs and events only, no direct table access
  • Key user extensions in-app, larger extensions on BTP
  • A written extension register, so nothing is invisible at upgrade time

Five stages of delivery inside the Activate phases

  1. Scope and deployment

    Value case, process scope, and a decision between public edition, private edition under RISE with SAP, or on-premise.

  2. Fit-to-standard

    Several weeks of workshops on a loaded sandbox, producing a signed backlog of real gaps.

  3. Build sprints

    Configuration, BTP extensions, Fiori roles and integrations delivered in sprints with a demo at the end of each.

  4. Test and data load

    Unit, integration and user acceptance cycles, then at least two full mock cutovers on migrated data.

  5. Go-live and hypercare

    Cutover on a rehearsed plan, then daily support through your first month-end close in S/4HANA.

Everything a greenfield build covers

  • Fit-to-standard backlog

    Every workshop decision recorded as a scope item accepted, adjusted or rejected, with the reason attached.

  • Configuration and org structure

    Company codes, plants, sales areas, purchasing organisations and the full module configuration behind them.

  • Data migration

    Masters and open items loaded with the SAP Migration Cockpit, reconciled against your legacy trial balance.

  • Fiori launchpad design

    Business roles, catalogues and spaces built per job, so a warehouse operator sees six tiles and not six hundred.

  • Integrations and extensions

    Integration Suite interfaces to banks and third-party systems, and BTP extensions on released APIs.

  • Hypercare

    Daily on-site or remote support through cutover and the first full month-end close, with a formal exit.

Why teams choose TCB Infotech for an S/4HANA build

  • We run Activate as written

    Quality gates at the end of every phase, and we will tell you when a gate should not be passed.

  • Standard first, always

    A deviation has to earn its place in front of your steering group, with a build cost attached.

  • Clean core is not optional

    No modifications to SAP objects. Extensions sit on BTP or in key user tooling, and they are registered.

  • Honest on edition

    If the public edition fits your processes, we say so, even though a private edition project bills more.

  • Fiori designed for jobs

    Launchpad roles built around what a person does in a day, which is what decides adoption.

SAP implementation questions

How long does a greenfield S/4HANA implementation take?

A focused single-country, single-entity build usually runs 9 to 12 months. Multiple legal entities, several plants or heavy integration work push it towards 18 months. The Explore phase alone accounts for several weeks of fit-to-standard workshops, and we will not compress that part, because every week skipped there turns into a change request later.

What does SAP Activate actually mean for us as the customer?

It means you start from a working system rather than a blank one. SAP ships preconfigured standard processes, we load them into a sandbox in the Prepare phase, and in Explore your process owners sit in front of the real screens and confirm or reject each step. Your job is to attend those workshops and make decisions. Activate fails when the business sends delegates who cannot sign anything off.

Should we go with S/4HANA Cloud public edition or private edition?

Public edition gives you a two-release-per-year upgrade cadence, a lower running cost and a hard limit on how far you can customise. Private edition, usually bought through RISE with SAP, keeps classic ABAP access and a slower upgrade schedule. If your processes are close to standard, the public edition constraint is doing you a favour, because it stops the modifications that make upgrades expensive. If you have genuinely differentiating manufacturing or industry logic, private edition is the honest answer.

Do we have to abandon the custom processes we run today?

Most of them, yes, and that is usually a win. In fit-to-standard we walk your process against the SAP standard and you justify every deviation in front of the group. Typically 80 to 90 percent of what looks custom is habit inherited from an older system. The remainder is real, and that is where the build effort and the extension budget should go.

What does clean core mean for our existing ABAP developers?

It means they stop modifying SAP objects and start building against released APIs instead. Extensions live on SAP BTP, in CAP or ABAP environment services, or as in-app key user extensions inside S/4HANA. The skills carry over, RAP and CDS are still ABAP, but the habit of changing standard code has to go. That single discipline is what decides whether your next upgrade costs two weeks or two quarters.

What happens after go-live?

We run hypercare through your first full month-end close in S/4HANA, because that is when the gaps in the chart of accounts, the tax setup and the reconciliation reports actually show up. Our team sits with finance and operations daily during that period. After the close is signed off, you move onto a support contract or take it in-house with the documentation we hand over.