Book a free consultation (opens in a new tab)

Cloud & DevOps / Backup & Disaster Recovery

Backup & Disaster Recovery Services

Backup schedules and disaster recovery plans for your infrastructure and data, with defined recovery time and point objectives and periodic restore testing to prove they work.

  • DefinedRTO and RPO set for every covered system
  • PeriodicRestore tests, not just backup jobs
  • 2-3 wksTypical time to a first tested backup
  • DocumentedRecovery steps, not just a backup

Why It Matters

An untested backup is a guess, not a plan

Recovery time and point objectives set per system

Not every system needs the same recovery target. We set RTO and RPO per system based on what it actually costs the business to be down or lose recent data.

  • RTO and RPO defined with your team
  • Priorities matched to business impact
  • Schedules built to meet the objective, not a generic default

Restore tests scheduled on a recurring basis

Backups are restored on a set schedule, in a controlled environment, so you know the recovery process works before you ever need it during a real incident.

  • Restore tests run on a fixed cadence
  • Failures logged and fixed, not ignored
  • Confidence backed by evidence, not assumption

From current backups to a tested recovery plan

  1. Assess current state

    We review what is backed up today, how often, and what would actually happen in an outage.

  2. Set RTO and RPO

    Recovery targets are set per system, based on what downtime or data loss would cost.

  3. Build the schedule

    Backup jobs and retention are configured to meet the objectives you set.

  4. Write the recovery plan

    Steps, owners and expected timelines are documented for each system.

  5. Test and repeat

    Restore tests run on a recurring cadence, with findings fixed and re-verified.

Everything needed to trust your recovery plan

  • Scheduled backups

    Backup jobs configured per system, matched to its recovery objectives.

  • Defined RTO and RPO

    Recovery time and point objectives set per system, not a single default.

  • Periodic restore testing

    Restores run on a schedule, so recovery is proven before it is ever needed.

  • Documented recovery steps

    Written steps and owners for each system, not tribal knowledge.

  • Ransomware-aware retention

    Retention and immutability settings cover accidental deletion and ransomware, not only hardware failure.

  • Connects to your stack

    Set up against your existing infrastructure, and can cover ERP or CRM data where relevant.

Why teams choose TCB Infotech for Backup & Disaster Recovery

  • We test restores, not just schedule backups

    A backup job that has never been restored is not a plan. We build testing into the schedule from day one.

  • Objectives set per system

    Not every system gets the same treatment. RTO and RPO are matched to real business impact.

  • Failures get fixed, not filed away

    A failed restore test is treated as a real finding, with a fix and a re-test before we call it done.

  • Plans your team can actually run

    Recovery steps are documented clearly enough for someone other than us to follow under pressure.

  • Ransomware and deletion in scope

    Retention and immutability are set to cover more than hardware failure alone.

Backup & Disaster Recovery, answered

What is the difference between a backup and a disaster recovery plan?

A backup is a copy of your data. A disaster recovery plan is the documented, tested process for actually getting systems back online using that copy, including who does what and how long it should take.

What are RTO and RPO, and how do you set them?

Recovery Time Objective is how long a system can be down before it causes serious harm, and Recovery Point Objective is how much data loss, measured in time, is acceptable. We set both with you per system, since not everything needs the same target.

Do you actually test restores, or just take backups?

We schedule periodic restore tests as part of the plan, not just the backup job itself. A backup that has never been restored is unverified, and that is where most disaster recovery plans quietly fail.

What happens if a restore test fails?

A failed restore test is treated as a finding, not a footnote. We document the cause, fix the underlying issue, and re-run the test before considering that system's recovery plan verified.

Does this cover ransomware and accidental deletion, not just hardware failure?

Yes. Backup retention and immutability settings are chosen to cover accidental deletion and ransomware scenarios, not only outright infrastructure failure.

How long does it take to set up backup and disaster recovery for existing systems?

A first system typically has backups, schedules and an initial restore test completed within two to three weeks, with additional systems phased in after that based on priority.

Related

The other services in this section, and related pages from TCB Infotech.

Start Testing Your Recovery Plan

No commitment. Start with your most critical system.