TCB Infotech | Expert Odoo & ERPNext Implementation Partner

Schedule Call With Us
Schedule Call With Us
Client Success Stories

Real Factories. Real Results. Measured in Numbers.

Every case study here is a manufacturer who replaced spreadsheets and disconnected systems with Odoo, ERP and never looked back.

50+
Manufacturers Served
12
Avg Weeks to Go Live
95%
Client Retention Rate
More Success Stories

Manufacturers Across Every Industry

From auto parts to food processing, here is what our clients achieved in their first year with a connected ERP system.

A
ERPNext Automotive
Automotive Parts Manufacturer

Cut order cycle time from 11 days to 4 days by connecting sales, production, and dispatch into one live system.

64% faster orders 35% less overstock 200+ SKUs tracked
Read their story ⟶
T
Odoo Textile
Textile Manufacturer

Moved six warehouses from paper-based stock records to a single live inventory system, eliminating weekly stock disputes overnight.

99.2% stock accuracy 3x faster dispatch 18-week go-live
Read their story ⟶
E
SAP HANA Heavy Engineering
Heavy Engineering Group

Connected six plants across three countries on one SAP HANA instance, giving leadership real-time visibility for the first time.

6 plants live 31% cost reduction Zero data silos
Read their story ⟶
M
ERPNext Metal Casting
Metal Casting Foundry

Reduced raw material waste by 22% in the first quarter after implementing real-time lot tracking and production costing in ERPNext.

22% less waste Full lot traceability 89% on-time delivery
Read their story ⟶
F
SAP HANA Food Processing
Food Processing Company

Achieved complete batch traceability from raw ingredient to finished product, making every audit a formality rather than a crisis.

99.8% inventory accuracy Full batch traceability 0 compliance failures
Read their story ⟶
P
Odoo Plastics Manufacturing
Plastics Manufacturer

Replaced 14 separate spreadsheets with one Odoo system in 10 weeks, cutting admin time nearly in half and putting shop floor data live.

10-week go-live 45% less admin time Live shop floor data
Read their story ⟶
50+
Manufacturers Served Worldwide
31%
Average Reduction in Operating Costs
12 wks
Average Time from Sign-off to Go-live
95%
Client Retention Rate Year on Year
Manufacturing factory floor
Your Turn

Ready to Write Your Own
Success Story?

Every manufacturer on this page started with a 30-minute call. We listened to their challenges, showed them what was possible, and built a plan around their factory. Let us do the same for yours.

✓ No commitment required ✓ 30-minute session ✓ Results in the first 90 days