SAP S/4HANA Manufacturing Case Study: Real-Time Planning Across Plants

Three plants ran on three systems and finance consolidated overnight, so nobody saw live cost or stock. SAP S/4HANA put the group on one real-time platform and the month-end close dropped from nine days to three.

3 days
Month-end close, down from 9
22%
Lower inventory
16 wk
Go-live timeline
Industry
Discrete Manufacturing, Multi-Plant
Company Profile
3 plants, around 600 staff
SAP Scope
S/4HANA, PP, MM, FI/CO
Go-Live
16 weeks
The Challenge

Three plants, three systems, an overnight close

Each plant ran its own system, and group finance pulled the numbers together overnight in batch jobs. By the time a report was ready, it was already a day behind, and nobody could see live cost or stock across the group.

  • Plant systems did not share a common data model.
  • Finance consolidated overnight, so the books were always a day late.
  • Group inventory was hard to value because stock sat in separate ledgers.
  • The month-end close took nine days of manual reconciliation.
The Solution

One SAP S/4HANA platform, updated in real time

We rolled out SAP S/4HANA on a single instance across all three plants, with the universal journal, embedded analytics and real-time material planning. Production and finance now read from the same live data.

  • One instance and one data model across every plant.
  • The universal journal posts finance and controlling together.
  • Real-time material planning replaces overnight batch runs.
  • Embedded analytics give live cost and stock without a separate report build.
S/4HANA PP MM FI/CO Embedded Analytics
How We Delivered

A phased rollout that kept every plant running

We started with a global template, piloted it at the largest plant, then rolled it to the other two with the lessons built in. Cutover ran over a weekend per plant so production never stopped for long.

Go-live took sixteen weeks, with TCB on site for each plant cutover and the first month-end close.

The Outcome

A three-day close and inventory under control

The month-end close fell from nine days to three because the data is already consolidated and live. Inventory dropped 22 percent once planning worked from one real-time view, and leaders see group cost as work happens.

We used to wait overnight to see how the group performed. Now finance and the plant floor read the same live numbers, and the close that took nine days is done in three.

Head of Operations, Manufacturing

What changed after go-live

3 days
Month-end close
22%
Lower inventory
3
Plants on one platform
16 wk
From kickoff to live
Start Your Project

Bring Every Plant Onto One Real-Time Platform

Book a short call with our SAP manufacturing team and see where S/4HANA pays back fastest.